Project score
Connectivity score
Location score
Investment score
Pre Launch Date : 18-Aug
Launch Date : 18-Aug
Possession : May 2023
Number of Units : 597
Tower Details : Number of towers:9
Floor Details : 18+Ground+2B
Total Free Space : 80 percent
Bangalore Electricity Supply Company (BESCOM):
Swimming Pool
Outdoor party Area
Children's Play Area
Basketball Court
Tennis
Club House
Cafeteria
Gymnasium
Rain Water Harvesting
StructureLift Make : 2 nos. of lifts i n each wing Main Door : Frame – Timber Architrave – Timber Shutters – with both side laminate ![]() Toilet Door : Frame – Timber Architrave – Timber Shutters – with both side laminate ![]() Other Internal Door : All other external doors to be manufactured in aaaialuminium/UPVC extruded frames and shutter with panels |
WindowMain Door : 8 feet high 7 feet high with wooden frames and laminated flush shutters ![]() Internal Doors : UPVC/ Aluminum frames and sliding shutters for all external doors |
Flooring General![]() Main Lobbies : Elegant lobby flooring in Ground Floor ![]() Common Lobbies & Corridors : Lift cladding in marble/ granite as per architect’s design Staircases - Main entry level : kota stone All other Staircases : All lobby walls will be finished with texture paint and ceiling in distemper |
Flooring![]() Individual Unit Foyer, Living & Dining : Vitrified tiles ![]() Master Bedroom : Vitrified tiles ![]() Kitchen : Vitrified tiles ![]() All Bedrooms : Vitrified tiles ![]() Balconies & Utility : Ceramic tiles ![]() Toilets : Ceramic tiles |
False Ceiling![]() DADO : Ceramic tile dado for 2 feet over the granite counter Provision for exhaust fan ![]() Lift Lobbies – Ground Floor : Lifts of suitable size and capacity will be provided in all ![]() Lift lobbies – Other floors : towers Lift cladding in marble/ granite as per architect’s design ![]() Servants Toilets : Vitrified/ Ceramic tile flooring and dado in the maid’s and toilet room |
Painting![]() Internal Walls & Ceilings : Premium Exterior Emulsion ![]() External finish : Internal walls and ceilings in OBD |
Electrical Outline Specification![]() 100% DG back up for lifts, pumps & common area lighting : Lifts of suitable size and capacity will be provided in all towers Lift cladding in marble/ granite as per architect’s design |